Published June 1977 | Version v1
Journal article

Recent progress in KEK preinjector

  • 1. National Lab. for High Energy Physics, Ibaraki, Japan

Description

The overall accelerating gap length is shortened to 18 cm in the high gradient accelerating column. A sparking rate of less than one per day is achieved by keeping a pressure of 2.5 x 10-4 torr in the column. The column current increases with the column pressure. It is plausible that the increased current is mainly due to molecular ions produced in a plasma expansion cup. The beam, which passes through focusing magnets, is scarcely affected by increasing the column pressure. An ion emissive plasma surface is located by a Langmuir probe. A multiple-canal duoplasmatron with seven anode holes is being developed

Additional details

Identifiers

Publishing Information

Journal Title
IEEE Transactions on Nuclear Science
Journal Volume
24
Journal Issue
3
Series
IEEE Trans. Nucl. Sci.
Journal Page Range
1121-1123
ISSN
0018-9499

Conference

Title
Particle accelerator conference.
Dates
16 Mar 1977.
Place
Chicago, IL, USA.

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
9363231
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
BEAM EMITTANCE; BEAM INJECTION; DUOPLASMATRONS; KEK LINAC; MILLI AMP BEAM CURRENTS; PERFORMANCE; PRESSURE DEPENDENCE
Descriptors DEC
ACCELERATORS; BEAM CURRENTS; CURRENTS; CYCLIC ACCELERATORS; ELECTRON TUBES; ION SOURCES; LINEAR ACCELERATORS; PLASMATRONS

Optional Information

Notes
Updated automatically by Metadata and Full-Text Enrichment Agent