Power plant cost estimates put to the test

Creators

  • 1. United Engineers and Constructors, Inc., Philadelphia, PA (USA)

Description

The growth in standards for nuclear applications and the impact of these codes and standards on the cost of nuclear power plants is described. The preparation of cost estimates and reasons for apparent discrepancies are discussed. Consistent estimates of nuclear power plant costs have been prepared in the USA for over a decade. They show that the difference in capital costs between nuclear and coal fired plants is narrowing and that when total generating costs are calculated nuclear power is substantially cheaper. (UK)

Additional details

Publishing Information

Journal Title
Nucl. Eng. Int.
Journal Volume
23
Journal Issue
273
Series
Nucl. Eng. Int.
Journal Page Range
39-43