Published June 1998
| Version v1
Report
Seismic margin of the steam line and feedwater line of the Dukovany-1 reactor unit within the hermetic zone. Part 2: hangers
Description
The report was developed within the seismic qualification procedure for the Dukovany-1 unit and deals with the steam lines and feedwater lines entering steam generators 1 through 6. Input data were taken from Part 1 of the report, dealing with the pipes
Availability note (English)
Available from Nuclear Research Institute Rez, 250 68 Rez, Czech Republic; e-mail contact: ret@nri.czAdditional details
Additional titles
- Original title (Czech)
- Mezni seismicka odolnost potrubi pary a napajeci vody EDU, blok 1, uvnitr hermeticke zony. Cast 2: zavesy
Publishing Information
- Imprint Pagination
- 15 p.
- Report number
- UJV--11088-T(Pt.2)
INIS
- Country of Publication
- Czech Republic
- Country of Input or Organization
- Czech Republic
- INIS RN
- 31027973
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Non-conventional Literature
- Descriptors DEI
- COMPUTER CALCULATIONS; DYNAMIC LOADS; EARTHQUAKES; MECHANICAL STRUCTURES; SPECTRAL RESPONSE; STEAM GENERATORS; STRESSES
- Descriptors DEC
- BOILERS; SEISMIC EVENTS; VAPOR GENERATORS
Optional Information
- Notes
- 7 tabs., 2 figs., 1 ref.