Published June 1998 | Version v1
Report

Seismic margin of the steam line and feedwater line of the Dukovany-1 reactor unit within the hermetic zone. Part 2: hangers

Description

The report was developed within the seismic qualification procedure for the Dukovany-1 unit and deals with the steam lines and feedwater lines entering steam generators 1 through 6. Input data were taken from Part 1 of the report, dealing with the pipes

Availability note (English)

Available from Nuclear Research Institute Rez, 250 68 Rez, Czech Republic; e-mail contact: ret@nri.cz

Additional details

Additional titles

Original title (Czech)
Mezni seismicka odolnost potrubi pary a napajeci vody EDU, blok 1, uvnitr hermeticke zony. Cast 2: zavesy

Publishing Information

Imprint Pagination
15 p.
Report number
UJV--11088-T(Pt.2)

INIS

Country of Publication
Czech Republic
Country of Input or Organization
Czech Republic
INIS RN
31027973
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Non-conventional Literature
Descriptors DEI
COMPUTER CALCULATIONS; DYNAMIC LOADS; EARTHQUAKES; MECHANICAL STRUCTURES; SPECTRAL RESPONSE; STEAM GENERATORS; STRESSES
Descriptors DEC
BOILERS; SEISMIC EVENTS; VAPOR GENERATORS

Optional Information

Notes
7 tabs., 2 figs., 1 ref.