Published September 1977
| Version v1
Journal article
C-E balances the benefits against the costs
Description
The Combustion Engineering philosophy on design standardisation for nuclear power plants, and developments resulting in the 3800 MWt, System 80 standard design are outlined. Specific changes made to previous designs are indicated. For practical reasons something less than complete standardisation had to be accepted. The success of the effort, shown by the measure of acceptance by the four utilities for which System 80 is being designed and built, is categorised and explained for various design features and components. Licensing procedures are discussed. A proper return on the high initial cost of introducing standard systems will only be achieved when changes in the licensing process reduce the total project span time. (U.K.)
Additional details
Publishing Information
- Journal Title
- Nucl. Eng. Int.
- Journal Volume
- 22
- Journal Issue
- 262
- Series
- Nucl. Eng. Int.
- Journal Page Range
- 59-62
- ISSN
- 0029-5507
INIS
- Country of Publication
- United Kingdom
- Country of Input or Organization
- United Kingdom
- INIS RN
- 9352646
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- COST; NUCLEAR POWER PLANTS; PWR TYPE REACTORS; REACTOR COMPONENTS; SPECIFICATIONS; STANDARDIZATION
- Descriptors DEC
- NUCLEAR FACILITIES; POWER PLANTS; REACTORS; THERMAL POWER PLANTS; WATER COOLED REACTORS; WATER MODERATED REACTORS