Production of semi-products of pipe bushings for nuclear power
Creators
Description
A procedure is described for the manufacture of semifinished pipe bushings 3200 and 3000 mm long, 400 and 200 mm i.d., which find use in the nuclear power industry for passing tubes through concrete walls of nuclear power plant vaults. An additional advantage of the process is in the fact that two bushings of different inner diameters emerge from double core drilling in a single forged piece, which results in better metal economy as well as in time, tool and power savings. (Z.S.). 1 fig
Files
26050496.pdf
Files
(155.0 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:5a9a7990a67c553123a6864567cf33cf
|
155.0 kB | Preview Download |
Additional details
Additional titles
- Original title (Czech)
- Zpusob vyroby polotovaru potrubnich pruchodek pro jadernou energetiku
Publishing Information
- Imprint Pagination
- 3 p.
- IPC:
- Int. Cl. B23B35/00.
- IPC
- Int. Cl. B23B35/00.
- Patent number
- CZ patent document 277827/B6/
INIS
- Country of Publication
- Czech Republic
- Country of Input or Organization
- Czech Republic
- INIS RN
- 26050496
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Descriptors DEI
- BUSHINGS; MACHINING; NUCLEAR POWER PLANTS; TUBES
- Descriptors DEC
- NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS
Optional Information
- Secondary number(s)
- CZ patent application 4046-87.