Dismantling equipment

  • 1. PROTEM SA, Etoile-sur-Rhone (France)

Description

The Protem machining unit F9-2000 scheduled to work on the experimental sodium cooled reactor KNK II at the research center of Karlsruhe has been engineered to achieve the complete dismantling of the reactor and of its internals. The decommissioning is being performed from the top of the vessel till reaching the lower level of the internals and then the final cutting of the vessel will be achieved from the bottom to the upper level

Part of:
Technical meeting on decommissioning of fast reactors after sodium draining. Working material

Additional details

Publishing Information

Imprint Title
Technical meeting on decommissioning of fast reactors after sodium draining. Working material
Imprint Pagination
750 p.
Journal Page Range
p. 119-138
Report number
TWG-FR--128

Conference

Title
Technical meeting on decommissioning of fast reactors after sodium draining
Dates
26-30 Sep 2005
Place
Cadarache (France)

INIS

Country of Publication
International Atomic Energy Agency (IAEA)
Country of Input or Organization
International Atomic Energy Agency (IAEA)
INIS RN
38003231
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
CONTAINERS; CUTTING; EQUIPMENT; KNK-2 REACTOR; REACTOR DECOMMISSIONING; REACTOR DISMANTLING; SODIUM
Descriptors DEC
ALKALI METALS; DECOMMISSIONING; DEMOLITION; ELEMENTS; ENRICHED URANIUM REACTORS; EPITHERMAL REACTORS; EXPERIMENTAL REACTORS; FAST REACTORS; HYDRIDE MODERATED REACTORS; LIQUID METAL COOLED REACTORS; MACHINING; METALS; POWER REACTORS; REACTORS; RESEARCH AND TEST REACTORS; SODIUM COOLED REACTORS; SZR TYPE REACTORS

Optional Information

Notes
Figs
Secondary number(s)
IAEA-TM--27329