Published 2005
| Version v1
Report
Dismantling equipment
Description
The Protem machining unit F9-2000 scheduled to work on the experimental sodium cooled reactor KNK II at the research center of Karlsruhe has been engineered to achieve the complete dismantling of the reactor and of its internals. The decommissioning is being performed from the top of the vessel till reaching the lower level of the internals and then the final cutting of the vessel will be achieved from the bottom to the upper level
Additional details
Publishing Information
- Imprint Title
- Technical meeting on decommissioning of fast reactors after sodium draining. Working material
- Imprint Pagination
- 750 p.
- Journal Page Range
- p. 119-138
- Report number
- TWG-FR--128
Conference
- Title
- Technical meeting on decommissioning of fast reactors after sodium draining
- Dates
- 26-30 Sep 2005
- Place
- Cadarache (France)
INIS
- Country of Publication
- International Atomic Energy Agency (IAEA)
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 38003231
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- CONTAINERS; CUTTING; EQUIPMENT; KNK-2 REACTOR; REACTOR DECOMMISSIONING; REACTOR DISMANTLING; SODIUM
- Descriptors DEC
- ALKALI METALS; DECOMMISSIONING; DEMOLITION; ELEMENTS; ENRICHED URANIUM REACTORS; EPITHERMAL REACTORS; EXPERIMENTAL REACTORS; FAST REACTORS; HYDRIDE MODERATED REACTORS; LIQUID METAL COOLED REACTORS; MACHINING; METALS; POWER REACTORS; REACTORS; RESEARCH AND TEST REACTORS; SODIUM COOLED REACTORS; SZR TYPE REACTORS
Optional Information
- Notes
- Figs
- Secondary number(s)
- IAEA-TM--27329