The Fort Calhoun power station began operation in September 1973. Since that time, modifications to the plant have required the addition of a substantial number of electrical and control components in the control room, which has resulted in an increased heat load in this area. Additionally, NUREG-0737, Item III.D.3.4, imposed requirements on the ventilating system related to protection of personnel from the effects of toxic and radioactive gas releases, which were not considered in the original design. Omaha Public Power District (OPPD) has recently undertaken a major modification to the Fort Calhoun station control room ventilating system to improve the safety margins for control room habitability. The goals of the modification were to achieve adequate cooling capacity with fully redundant equipment, improve habitability under accident conditions, and eliminate several potential problems related to steam line break and equipment qualification. Additionally, the scope of the project grew as design problems emerged

Additional details

Publishing Information

Journal Title
Transactions of the American Nuclear Society
Journal Volume
59
Series
Trans. Am. Nucl. Soc.
Journal Page Range
235-236
ISSN
0003-018X
CODEN
TANSA

Conference

Title
Annual meeting of the American Nuclear Society.
Dates
4-8 Jun 1989.
Place
Atlanta, GA (USA).

Optional Information

Secondary number(s)
CONF-890604--.