Rolling test of turbine generator by non-nuclear steam

  • 1. Qinshan Nuclear Power Company, Haiyan, Zhejinang (China)

Description

The object and procedure of rolling turbine generator test by non-nuclear steam in Qinshan NPP are presented. The steam source of rolling test is compared and chosen. The steam quantity during the rolling test is simply calculated. The limits of parameters of the test and the preparing for rolling of turbine generator are introduced. Procedures of rolling test are divided into three stage of speed: 600 r/min, 1200 r/min, 3000 r/min. Parameters measured as a result of rolling test, such as absolute vibration of axle, metal temperature of bearings, temperature of oil from the exit of bearings and vacuity of condenser etc, show that the design, manufacture, installation and speed control of turbine generator are satisfactory

Additional details

Publishing Information

Journal Title
Nuclear Power Engineering
Journal Volume
14
Journal Issue
1
Journal Page Range
p. 59-63.
ISSN
0258-0926
CODEN
HDGOE6