Published 1992
| Version v1
Report
Preliminary project definition for long duration. Tests of coal fired MHD generators
Creators
Description
In its final report the Faraday Working Group recommended the CEC amongst others to explore the possibility of a long duration test of a 'state-of-the-art', MHD-generator in order to remove uncertainties concerning the lifetime and availability of such a generator design. The duration of the test should be several thousands of hours, considerably more than the duration tests carried out until now. The scope of the present study is to prepare a project definition document for a long duration test of a coal fired, state-of-the-art MHD-generator
Additional details
Publishing Information
- Imprint Title
- Coal-fired magnetohydrodynamic (MHD) electric power generation
- Imprint Pagination
- 234 p.
- Journal Page Range
- p. 149-184.
- Report number
- EUR--13928
Conference
- Title
- Extended Faraday Working Group Meeting.
- Dates
- 15 Nov 1990.
- Place
- Brussels (Belgium).
INIS
- Country of Publication
- European Commission (EC), Brussels (Belgium)
- Country of Input or Organization
- European Commission (EC), Brussels (Belgium)
- INIS RN
- 24012353
- Subject category
- S01: COAL, LIGNITE, AND PEAT;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- COST ESTIMATION; ELECTRODES; LIFETIME; MHD GENERATORS; TEST FACILITIES
- Descriptors DEC
- DIRECT ENERGY CONVERTERS