River Protection Project System Plan, Rev. 8 - 18661

Description

The River Protection Project System Plan comprises a set of scenarios that evaluate options for safely treating the high-level radioactive waste stored in underground tanks at the DOE Hanford Site. It establishes a baseline case, used for communicating the DOE's strategy to various stakeholders, as well as ten alternative scenarios that evaluate initiatives to potentially accelerate cleanup and/or address risks. The scenarios were modeled using TOPSim, a custom flowsheet simulator that includes chemistry and mass transfer elements used to estimate operating durations and completion dates, quantities of waste treated through various processes, as well as the time required to complete treatment. The TOPSim results are aligned to a resource-loaded OracleR Primavera P6 schedule to estimate the life cycle cost of the cleanup mission. This paper will outline the results of the System Plan, Rev. 8 modeling effort. (authors)

Availability note (English)

Available from: WM Symposia, Inc., PO Box 27646, 85285-7646 Tempe, AZ (United States)

Additional details

Publishing Information

Imprint Pagination
15 p.
Report number
INIS-US--20-WM-18661

Conference

Title
44. Annual Waste Management Conference
Acronym
WM2018
Dates
18-22 Mar 2018
Place
Phoenix, AZ (United States)

INIS

Optional Information

Notes
15 refs.; Available online at: https://www.xcdsystem.com/wmsym/2018/index.html