Acceptance Test Plan for Fourth-Generation Corrosion Monitoring Cabinet
Creators
Description
This Acceptance Test Plan (ATP) will document the satisfactory operation of the third-generation corrosion monitoring cabinet (Hiline Engineering Part No.0004-CHM-072-C01). This ATP will be performed by the manufacturer of the cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinet. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation
Availability note (English)
Available from INIS in electronic form; Also available from OSTI as DE00805386; PURL: https://www.osti.gov/servlets/purl/805386-SmKFB7/webviewable/
Files
Additional details
Identifiers
Publishing Information
- Imprint Pagination
- 10 p.
- Report number
- RPP--7034
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 34025771
- Subject category
- S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
- Descriptors DEI
- CORROSION; EQUIPMENT PROTECTION DEVICES; MONITORING; PERFORMANCE TESTING; RADIOACTIVE WASTE STORAGE; SAFETY ENGINEERING; STORAGE FACILITIES
- Descriptors DEC
- CHEMICAL REACTIONS; ENGINEERING; MANAGEMENT; RADIOACTIVE WASTE MANAGEMENT; STORAGE; TESTING; WASTE MANAGEMENT; WASTE STORAGE
Optional Information
- Contract/Grant/Project number
- AC27-99RL14047
- Funding organization
- USDOE Office of Environmental Management (EM) (United States)