Published October 23, 2000 | Version v1
Report Restricted

Acceptance Test Plan for Fourth-Generation Corrosion Monitoring Cabinet

Description

This Acceptance Test Plan (ATP) will document the satisfactory operation of the third-generation corrosion monitoring cabinet (Hiline Engineering Part No.0004-CHM-072-C01). This ATP will be performed by the manufacturer of the cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinet. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation

Availability note (English)

Available from INIS in electronic form; Also available from OSTI as DE00805386; PURL: https://www.osti.gov/servlets/purl/805386-SmKFB7/webviewable/

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
10 p.
Report number
RPP--7034

Optional Information

Contract/Grant/Project number
AC27-99RL14047
Funding organization
USDOE Office of Environmental Management (EM) (United States)