Published October 1985 | Version v1
Journal article

Operational results of optics handling and closed orbit correction in the TRISTAN accumulation ring

  • 1. National Laboratory for High Energy Physics (KEK), Oho-machi, Tsukuba-gun, Ibaraki-ken

Description

The optics handling system of the TRISTAN accumulation ring (AR) is facilitated by the general purpose computer of KEK as well as the machine control computers and has been dealing with many kinds of optics successfully since November 1983. Also a series of correction procedures has reduced r.m.s. values of closed orbit distortion(c.o.d.) at position monitors from 8.5mm to 0.6mm horizontally, and from 2.3mm to 0.3mm vertically in the typical optics of AR. Using the estimated errors, the pre-correction facility has been installed in AR to make an orbit correction possible in a completely new optics before beam injection

Additional details

Publishing Information

Journal Title
IEEE Trans. Nucl. Sci.
Journal Volume
NS-32
Journal Issue
5
Series
IEEE Trans. Nucl. Sci.
Journal Page Range
2065-2067
ISSN
0018-9499
CODEN
IETNA

Conference

Title
Particle accelerator conference.
Dates
13-16 May 1985.
Place
Vancouver (Canada).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
17051446
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
BEAM INJECTION; BEAM MONITORING; BEAM MONITORS; BEAM OPTICS; BEAM POSITION; KEK LINAC; KEK SYNCHROTRON; ON-LINE CONTROL SYSTEMS; TRISTAN STORAGE RINGS
Descriptors DEC
ACCELERATORS; CONTROL SYSTEMS; CYCLIC ACCELERATORS; LINEAR ACCELERATORS; MEASURING INSTRUMENTS; MONITORING; MONITORS; ON-LINE SYSTEMS; STORAGE RINGS; SYNCHROTRONS

Optional Information

Secondary number(s)
CONF-850504--.