Published June 2013 | Version v1
Journal article

GIS-based site selection methodology for hybrid renewable energy systems: A case study from western Turkey

  • 1. Institute of Urban Water Management, University of Kaiserslautern, 67663 Kaiserslautern (Germany)
  • 2. Department of Civil Engineering, Middle East Technical University, 06800 Ankara (Turkey)
  • 3. Geodetic and Geographic Information Technologies, Middle East Technical University, 06800 Ankara (Turkey)

Description

Highlights: ► We proposed a site selection methodology for renewable energy systems. ► Fuzzy logic and geographic information system tools are used. ► Alternative locations are evaluated in terms of economic and environmental criteria. - Abstract: Renewable energy sources are presently being considered as alternatives to fossil fuels, because they are perpetual, environmentally friendly, and release negligible amounts of greenhouse gases to the atmosphere while producing energy. A disadvantage of renewable energy systems, however, is that continuous energy generation is not possible by using only one type of renewable energy system, since renewable energy resources depend on climate and weather conditions. Two or more renewable energy systems can be integrated into a hybrid system to overcome this problem so that when one resource is not available, the other can continue producing energy. Another disadvantage of renewable energy sources is that they are not available at every geographic location. Their use is mostly advantageous at remote locations that often are of high ecological value. Thus, identification of preferable locations for renewable energy systems is a decision-making problem that requires evaluation of the potential of the resource together with economic and environmental limitations. This paper introduces a methodology for site selection of hybrid wind solar–PV renewable energy systems. First, environmental acceptability and economic feasibility objectives are identified through a comprehensive review of the literature, current Turkish laws and legislations, and interviews with the General Directorate of Electrical Power Resources Survey and Development Administration of Turkey. Second, viable locations in terms of environmental acceptability and economic feasibility are determined through a fuzzy decision-making procedure that uses ordered weighted averaging algorithm for aggregating multiple objectives. Then, priority sites are identified separately for wind and solar energy systems by using Geographic Information System (GIS) and finally associated maps are overlaid to obtain the most feasible locations for hybrid wind solar–PV systems

Availability note (English)

Available from http://dx.doi.org/10.1016/j.enconman.2013.02.004

Additional details

Identifiers

DOI
10.1016/j.enconman.2013.02.004;
PII
S0196-8904(13)00084-8;

Publishing Information

Journal Title
Energy Conversion and Management
Journal Volume
70
Journal Page Range
p. 90-106
ISSN
0196-8904
CODEN
ECMADL

INIS

Country of Publication
United Kingdom
Country of Input or Organization
International Atomic Energy Agency (IAEA)
INIS RN
46001001
Subject category
S14: SOLAR ENERGY;
Descriptors DEI
DECISION MAKING; FUZZY LOGIC; GEOGRAPHIC INFORMATION SYSTEMS; SITE SELECTION; SOLAR ENERGY; TURKEY
Descriptors DEC
ASIA; DEVELOPING COUNTRIES; ENERGY; ENERGY SOURCES; INFORMATION SYSTEMS; MATHEMATICAL LOGIC; MIDDLE EAST; RENEWABLE ENERGY SOURCES

Optional Information

Copyright
Copyright (c) 2013 Elsevier Science B.V., Amsterdam, The Netherlands, All rights reserved.