Published October 24, 2000 | Version v1
Report Restricted

Task Technical and Quality Assurance Plan for Testing Methods to Reduce 235 Uranium Enrichment in Tank 43H Supernatant Liquid

Description

In July of 1997, the 2H-Evaporator was shutdown due to the inability to lift material from the vessel. Inspections of the gravity drain line (GDL) showed a scale deposit coating the inside of the line. A Sample of the material was obtained and analyses performed. Plans are to chemically clean the evaporator pot by dissolving the solids in a 1.5M nitric acid solution containing depleted uranium

Availability note (English)

Available from INIS in electronic form; Also available from OSTI as DE00766285; PURL: https://www.osti.gov/servlets/purl/766285-8FFH3X/webviewable/

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
14 p.
Report number
WSRC-RP--2000-00797/Rev.0

Optional Information

Contract/Grant/Project number
AC09-96SR18500
Funding organization
US Department of Energy (United States)