Published August 2015 | Version v1
Miscellaneous

The operation status of the superconducting cavity for cERL main linac. Toward the deep understanding inside the superconducting cavity with high current beam

  • 1. Nippon Advanced Technology, Co., Ltd., Tokai, Ibaraki (Japan)
  • 2. High Energy Accelerator Research Organization (KEK), Tsukuba, Ibaraki (Japan)
  • 3. Japan Atomic Energy Agency (JAEA), Tokai, Ibaraki (Japan)

Description

We started beam operation with Compact ERL(cERL) main linac cryomodule from 2013.Dec. Until now, we succeeded energy recovery with 80 uA CW beam current of 20 MeV. For stable beam operation with more high current CW beam, it is necessary to know the phenomina inside the superconducting cavity during beam operation, for example, increasing field emission. In order to know these phenomina, several fast monitors were set and monitored when the unexpected trip and/or radiation increase were occurred with beam. In this paper, we describe the details of long-term operation experience of these cavities by using these monitors. (author)

Part of:
Proceedings of the 12th annual meeting of Particle Accelerator Society of Japan

Additional details

Publishing Information

Imprint Title
Proceedings of the 12th annual meeting of Particle Accelerator Society of Japan
Imprint Pagination
1419 p.
Journal Page Range
p. 566-570

Conference

Title
12. annual meeting of Particle Accelerator Society of Japan
Dates
5-7 Aug 2015
Place
Tsuruga, Fukui (Japan)

Optional Information

Notes
1 ref., 15 figs., 1 tab.