Published October 14, 1994 | Version v1
Report Open

105-KE basin pilot run relocation

Description

The purpose of this document is to present the bases for selecting the exact in-facility location for installation of process equipment to support pilot testing activities in the 105-KE Basin at the United States Department of Energy Hanford Site, in southeastern Washington State. The 105-KE Basin was constructed during the early 1950s, as an integralcomponent of the 105-K East reactor building. Similar basins were provided in all Hanford weapons production reactor buildings to receive fuel elements discharged from the reactors and stage them for rail transport to 200 Area fuel reprocessing plants. The 105-KE reactor began operation in 1955. It was shut down in 1971. However, the 105-KE Basin was reactivated several years later to store spent fuel from the N-Reactor basin and permit its continued operation during outages at the Plutonium Uranium Extraction (PUREX) plant in the 200E Area

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95002366; NTIS; US Govt. Printing Office Dep.

Files

26034296.pdf

Files (3.5 MB)

Name Size Download all
md5:460d0baf08c24948243ed0dfee861bab
3.5 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
19 p.
Report number
WHC-SD--SNF-PD-001

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930
Funding organization
USDOE, Washington, DC (United States).