Published May 1, 2003 | Version v1
Report

CEBAF Energy Recovery Experiment

Description

A successful GeV scale energy recovery demonstration with high ratio of accelerated-to-recovered energies (50:1) was recently carried out on the CEBAF recirculating linear accelerator. Future high energy (multi-GeV), high current (hundreds of milli-Amperes) beams would require gigaWatt-class RF systems in conventional linacs - a prohibitively expensive proposition. However, invoking energy recovery (1) alleviates extreme RF power demands; required RF power becomes nearly independent of beam current, which improves linac efficiency and increases cost effectiveness. Furthermore, energy recovering linacs promise efficiencies of storage rings, while maintaining beam quality of linacs: superior emittance and energy spread and short bunches (sub-pico sec.). Finally, energy recovery alleviates shielding, if the beam is dumped below the neutron production threshold.

Additional details

Publishing Information

Imprint Pagination
vp.
Report number
JLAB-ACC--03-223

Conference

Title
Particle Accelerator Conference
Acronym
PAC 2003
Dates
12-16 May 2003
Place
Portland, OR (United States)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
41097224
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
BEAM CURRENTS; CEBAF ACCELERATOR; EFFICIENCY; ENERGY RECOVERY; LINEAR ACCELERATORS; NEUTRONS; POWER DEMAND; PRODUCTION; RF SYSTEMS; SHIELDING; STORAGE RINGS
Descriptors DEC
ACCELERATORS; BARYONS; CURRENTS; DEMAND; ELEMENTARY PARTICLES; FERMIONS; HADRONS; LINEAR ACCELERATORS; NUCLEONS

Optional Information

Contract/Grant/Project number
AC05-84ER40150
Funding organization
US Department of Energy (United States)
Secondary number(s)
DOE/ER--40150-4419