Published October 1987 | Version v1
Report Restricted

HFIR [High Flux Isotope Reactor] pressure vessel and structural components materials surveillance program: Supplement 1

Description

Extending the life of the HFIR vessel by the proposed 10 effective full-power years is contingent upon a continuation of the materials surveillance program and the application of hydrostatic proof testing. As a part of the surveillance program, Charpy V-notch (CVN) specimens of shell, weld and nozzle materials are installed adjacent to the inner surface of the vessel and are removed periodically for testing to determine the radiation-induced increase in the nil-ductility transition temperature. Hydro testing is conducted to prove that a critical combination of flaw size, stress and fracture toughness does not exist. Information from the materials surveillance program is used in a fracture mechanics analysis to confirm that the hydro-test pressure being applied is appropriate for the desired life extension of the vessel. This report specifies (1) the number, type, location and schedule for removal-testing of the CVN specimens for the continuing materials surveillance program, and (2) the procedures and test conditions for the hydro test

Availability note (English)

Available from NTIS, PC A04/MF A01; 1 as DE88001593.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
58 p.
Report number
ORNL/TM--1372/S1

Optional Information

Notes
Portions of this document are illegible in microfiche products.