Published 2021 | Version v1
Miscellaneous

Commissioning of the new 1.0GeV electron linac for NewSUBARU storage ring

  • 1. RIKEN SPring-8 Center, Sayo, Hyogo (Japan)

Description

A new 1.0 GeV electron linac for the NewSUBARU storage ring was constructed at the end of 2020. After the beam commissioning, we succeed in accelerating the stable beam with a good performance in March 2021. The linac consists of a grid-controlled thermionic cathode RF gun, a 476 MHz buncher cavity, an S-band accelerating tube, and the C-band accelerating tubes, featuring a compact size and low cost. We were able to resume user operation with the new injector four weeks earlier than the planned date. (author)

Availability note (English)

Available from https://www.pasj.jp/web_publish/pasj2021/proceedings/PDF/TUOB/TUOB03.pdf
Part of:
Proceedings of the 18th annual meeting of Particle Accelerator Society of Japan

Additional details

Additional titles

Original title (Japanese)
ニュースバル1.0GeV新入射器の建設とコミッショニング運転

Publishing Information

Imprint Title
Proceedings of the 18th annual meeting of Particle Accelerator Society of Japan
Imprint Pagination
[998 p.]
Journal Page Range
p. 102-105

Conference

Title
18. annual meeting of Particle Accelerator Society of Japan
Acronym
PASJ2021
Dates
9-12 Aug 2021
Place
Online-held (Japan)

Optional Information

Notes
7 refs., 8 figs., 2 tabs. Imprint:This symposium was held online