Production capability: ERDA methods and results
Description
Production centers are categorized into four classes, according to the relative certainty of future production. A ''forward cost'' basis is used to establish both the resource base and to define the acceptable production centers. The first phase of the work is called the ''Could'' capability. Resources are assigned to existing production centers, or new production centers are postulated based on adequate resources to support a mill for a reasonable economic life. A production schedule is developed for each center. The last step in the ''Could'' study is to aggregate the capital and operating costs. The final step in the Production Capability study is the rescheduling of the production from the ''Could'' to produce only sufficient U concentrate to meet the feed requirements of enrichment facilities operated at the announced transaction tails assay plans. The optimized production schedules are called the ''Need'' production capability. A separate study was also performed of industry production plans. 4 tables, 7 figs
Additional details
Publishing Information
- Publisher
- American Nuclear Society.
- Imprint Place
- Hinsdale, IL
- Imprint Title
- Executive conference on uranium fuel supply
- Journal Page Range
- p. 26p, Paper 2.
Conference
- Title
- Conference of the American Nuclear Society.
- Dates
- 24 Jan 1977.
- Place
- Monterey, California, United States of America (USA).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 9362337
- Subject category
- S11: NUCLEAR FUEL CYCLE AND FUEL MATERIALS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- COST; ECONOMICS; FORECASTING; PRODUCTION; URANIUM; US ERDA
- Descriptors DEC
- ACTINIDES; ELEMENTS; METALS; NATIONAL ORGANIZATIONS; US ORGANIZATIONS
Optional Information
- Notes
- Imprint:See CONF-770109--.