Optimized FFTF Acceptance Test Program covering Phases III, IV, and V
Description
A detailed review of Phases III, IV, and V of the FFTF Acceptance Test Program has been completed. The purpose of this review was to formulate that test sequence which not only meets requirements for safe, reliable and useful operation of the plant, but also results in the earliest prudent demonstration of full-power performance. A test sequence based on the underlying assumption that sodium flows into the secondary sodium storage tank (T-44) no later than August 31, 1978, is described in detail. A time-scale which allows extra time to put systems and equipment into operation the first time, debugging, and learning how to operate most effectively has been superimposed on the test sequence. Time is not included for major equipment malfunctions. This test plan provides the basis for coordinating the many and varied activities and interfaces necessary for successful and timely execution of the FFTF Acceptance Test Program. In this report, the need dates have been identified for presently scheduled test articles and standard core components
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS., PC A05/MF A01.Files
10452812.pdf
Files
(2.7 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:f1480dc35c144452462dc47b4cedf633
|
2.7 MB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 84 p.
- Report number
- HEDL-SA--1505
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 10452812
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- FFTF REACTOR; PLANNING; TESTING
- Descriptors DEC
- EPITHERMAL REACTORS; FAST REACTORS; LIQUID METAL COOLED REACTORS; REACTORS; RESEARCH AND TEST REACTORS; RESEARCH REACTORS; SODIUM COOLED REACTORS; TEST REACTORS