Point Lepreau Generating Station - 1995 SLAR program

Creators

  • 1. New Brunswick Power, Lepreau, NB (Canada)

Description

The Pt. Lepreau SLAR Program began after the successful use of the SLAR MKIII Tool during the 1993 Pt. Lepreau G.S. Maintenance outage. Preparations began immediately to assemble staff and equipment to complete a full core SLAR starting in April 1995. Installation and commissioning of the SLAR System at site began on March 29/95 and on reactor operations started on April 15/95. A total of 372 channels were visited with SLAR and all but 4 were dispositioned to the target life of 241, 500 Effective Full Power Hours. SLAR operations were completed on October 5/95 and within 7 days the Fuel Handling System was returned to pre-SLAR configuration and functionally tested. The SLAR Program was completed on schedule and within budget. (author)

Files

30032411.pdf

Files (430.2 kB)

Name Size Download all
md5:d666e0a0b0c8b08e1a5e6e8635682e70
430.2 kB Preview Download
Part of:
Proceedings of the seventeenth annual Canadian Nuclear Society conference

Additional details

Publishing Information

Imprint Title
Proceedings of the seventeenth annual Canadian Nuclear Society conference
Imprint Pagination
820 p.
Journal Page Range
v. 2 [15 p.]
Report number
INIS-CA--0066(v.1,2)

Conference

Title
17. annual Canadian Nuclear Society conference
Dates
9-12 Jun 1996
Place
Fredericton, NB (Canada)

Optional Information

Notes
3 figs., 4 tabs., 5 figs.