Published June 1977 | Version v1
Journal article

Operation experiences with the test section of a superconducting heavy ion post accelerator

Description

The 0.5 MV test section of a superconducting heavy ion post accelerator built at Karlsruhe was operated for 1000 h at the beam line of the MP tandem at Heidelberg. Prototype tests carried out under realistic conditions now ensure the basis for the detailed design of a full scale accelerator. The performance tests reported here include 500 h of high field operation and 40 h of beam acceleration time. Poor vacuum conditions were found to increase electron emission in the superconducting resonators. The surface properties however could be restored by a single oxipolishing step. Beam loss during long term operation was simulated by direct ion irradiation at the operating temperature and at 300 K. A total dose of up to 2 x 1014 Ni-ions per cm2 (average value over 12 cm2) was found to have no influence on the superconducting surface properties. The cooling system and the rf control system were found to operate satisfactory. The required field stability was reliably obtained

Additional details

Identifiers

Publishing Information

Journal Title
IEEE Transactions on Nuclear Science
Journal Volume
24
Journal Issue
3
Series
IEEE Trans. Nucl. Sci.
Journal Page Range
1150-1152
ISSN
0018-9499

Conference

Title
Particle accelerator conference.
Dates
16 Mar 1977.
Place
Chicago, IL, USA.

Optional Information

Notes
Updated automatically by Metadata and Full-Text Enrichment Agent