Published 1993 | Version v1
Miscellaneous Open

Evaluation of the Cerro Solo nuclear ore, province of Chubut. On the economic parameters of the deposit. Pt. 3

Description

Preliminary results of the resources estimation carried out in the Cerro Solo uranium ore deposit, located in the Chubut Province, 1900 km SW from Buenos Aires and 380 Km W from Trelew, presented in tonnes of uranium recoverable at costs up to U$S 80/kgU, are as follows: a) Reasonable assured resources (indicated): 800 tU; b) Estimates Additional Resources (inferred): 2200 tU. Economic evaluation at the order-of-magnitude level, performed using the grade-tonnage model of the deposit, resulted a useful tool in the different stages of the project to identify the influence of technical parameters on the potential profitability. Research about feasibility of in-situ leaching method of exploitation for this deposit introduces an interesting alternative for future uranium production in the country. (Author)

Availability note (English)

MF available from INIS under the Report Number.

Files

24059913.pdf

Files (319.6 kB)

Name Size Download all
md5:f4b5716defeb2e36b0b3a6d39d4ff69f
319.6 kB Preview Download

Additional details

Additional titles

Original title (Spanish)
Evaluacion de la mina nuclear Cerro Solo, provincia del Chubut. Sobre los parametros economicos del deposito. Pte. 3

Publishing Information

Imprint Pagination
15 p.
Report number
INIS-AR--018

Conference

Title
12. Argentine geological congress; 2. Congress of hydrocarbons' exploration.
Original Conference Title
12. Congreso geologico argentino
Dates
10-15 Oct 1993.
Place
Mendoza (Argentina).

Optional Information

Notes
Pre-conference paper.