Published May 1982 | Version v1
Report Restricted

Integrated plant safety assessment systematic evaluation program. R.E. Ginna Nuclear Power Plant, Rochester Gas and Electric Corporation, Docket No. 50-244

Description

The Systematic Evaluation Program was initiated in February 1978 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to reconfirm and document their safety. The review provides (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of the R.E. Ginna Nuclear Power Plant (located in Wayne County near Rochester, NY), one of ten plants reviewed under Phase II of this program, and indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review. It is expected that this report will be one of the bases in considering the issuance of a full-term operating license in place of the existing provisional operating license

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS. MF A0 as DE82904572.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
378 p.
Report number
NUREG--0821