Published July 2006 | Version v1
Journal article

Outline of underground research roadway of Horonobe deep underground research program and its support design

  • 1. Japan Atomic Energy Agency, Horonobe Underground Research Center, Horonobe, Hokkaido (Japan)
  • 2. Japan Atomic Energy Agency, Geological Isolation Research and Development Directorate, Horonobe, Hokkaido (Japan)
  • 3. Nikken Sekkei Civil Engineering Ltd., Ground Designing Department, Osaka, Osaka (Japan)

Description

The results of underground research roadway design of Horonobe deep underground research program are as followings; 1) the core observation and analysis of rock experiments data made clear to generate discontinuous behavior originated from crack, 2) the strength and elastic coefficients of rock are determined under the consideration of effects of crack, and 3) the double support structure was introduced into dig of underground under the conditions of rock with small strength. The underground environment, execution method, determination of various constants of rock, analytical model of support, support materials, estimation of stability of rock around cavity, double support structure, and discussion are reported. (S.Y.)

Additional details

Publishing Information

Journal Title
Denryoku Doboku
Journal Issue
no.324
Journal Page Range
p. 82-86
ISSN
0386-2895