Fermilab R and D program in medium energy electron cooling

  • 1. Fermi National Accelerator Lab., Batavia, IL (United States)

Description

Fermilab began an R and D program in medium energy electron cooling in April1995 with the object of cooling 8 GeV antiprotons in a new 3.3 km permanent magnet storage ring (recycler) to be built in the same tunnel as the main injector (MI). The MI is to be completed in 1998, and it is planned toinstall the recycler by the end of 1997 to reduce interference during the final rush of MI installation. Although the recycler will employ stochastic cooling initially, its potential for contributing an order of magnitude to Tevatron collider luminosity is tied to electron cooling. The short time scale and Fermilab's limited familiarity with low energy electron beams has given rise to a two-phase development plan. The first phase is to build a cooling system based on an electron beam of ≥200 mA before the year 2000. The second phase of about three years is planned to reach an electron current of 2 A or more. This report describes the general scheme for high luminosity collider operation as well as the R and D plan and progress to date. (orig.)

Additional details

Publishing Information

Journal Title
Nuclear Instruments and Methods in Physics Research. Section A, Accelerators, Spectrometers, Detectors and Associated Equipment
Journal Volume
391
Journal Issue
1
Journal Page Range
p. 131-137.
ISSN
0168-9002
CODEN
NIMAER

Conference

Title
11. international advanced beam dynamics workshop on beam cooling and instability damping dedicated to the 30th anniversary of the electron cooling.
Dates
18-28 Jun 1996.
Place
Moscow (Russian Federation); Nizhny Novgorod (Russian Federation).