Published 1997 | Version v1
Book

Experimental survey of HT-7 superconducting tokamak

  • 1. Academia Sinica, Hefei, AH (China). Inst. of Plasma Physics

Description

The operating plan for HT-7 Superconducting tokamak considers the staging of its hardware capabilities after finished its construction. Superconducting magnet of toroidal coils enters upon the superconducting phase after cooling down in 4 days, and then it is charged to 2.4 tesla., but it is reduced to 1.4 tesla or so when operation of ohmic discharge. Two experimental items, in this operation, are performed as following. A) increasing flux swing by bias-magnetism for getting longer pulses ohmic plasma is conducted. A 1s flat-top duration discharge is achieved with a lower safety factor qa (∼2). Plasma current is up to 0.16 MA, loop voltage ∼1V, chord-average density 1.3 x 1019 m-3, Te(0) > 1 keV and Ti = 0.3 keV without any auxiliary heating; B) plasma current modulation for investigations both of plasma current feedback controlling and plasma current profile with LHCD and ICRF which will be preformed in the next experiment. The details physical investigation, in this operation, is less because of some technological troubles. (author)

Part of:
Proceedings of the 1996 international conference on plasma physics

Additional details

Publishing Information

Publisher
Japan Society of Plasma Science and Nuclear Fusion Research
Imprint Place
Nagoya (Japan)
ISBN
4-9900586-1-5; 4-9900586-2-3
Imprint Title
Proceedings of the 1996 international conference on plasma physics
Imprint Pagination
2147 p.
Journal Page Range
p. 1258-1261

Conference

Title
1996 international conference on plasma physics
Acronym
ICPP96
Dates
9-13 Sep 1996
Place
Nagoya (Japan)

Optional Information

Notes
Imprint:Published in 2 volumes