Published 1989 | Version v1
Miscellaneous

Primary heat transport system bleed valve erosion and repairs

  • 1. Ontario Hydro, Tiverton, ON (Canada). Bruce Nuclear Generating Station-A

Description

Bruce Nuclear Generating Station 'B' (BNGS'B') consists of 4 - 930 MW CANDU units (Units 5 to 8). the station, located on the shores of Lake Huron, is part of the Ontario Hydro Bruce Nuclear Power Development. This paper describes the bleed valve body wall loss discovered during operation and the subsequent efforts to correct the problem. The type and extent of damage is outlined as well as the repair method used. To ensure reliable, long term operation of the valves, a rigorous investigation was undertaken to identify the failure mechanism. Once a failure mode was established, long term solutions could be implemented to ensure valve integrity. (author). 3 refs., 1 tab., 6 figs

Part of:
Proceedings of the 29th annual conference of the Canadian Nuclear Association and 10th annual conference of the Canadian Nuclear Society. V. 1-3

Additional details

Publishing Information

ISBN
0-919307-39-6; 0-919784-17-8
Imprint Title
Proceedings of the 29th annual conference of the Canadian Nuclear Association and 10th annual conference of the Canadian Nuclear Society. V. 1-3
Imprint Pagination
3 v. [1200 p.].
Journal Page Range
v. 3 p. 16.1-16.6.
ISSN
0706-1293; 0227-1907
Report number
INIS-mf--14668

Conference

Title
10. annual conference of the Canadian Nuclear Society.
Dates
4-7 Jun 1989.
Place
Ottawa, ON (Canada).

Optional Information