Published October 1993 | Version v1
Report Open

Evaluation of options for disposition of dispersible material in B-Cell

  • 1. Pacific Northwest Lab., Richland, WA (United States)
  • 2. Westinghouse Hanford Co., Richland, WA (United States)

Description

The radioactive contaminants in the dispersible material in B-cell of the 324 Building Radiochemical Energy (RE) hot-cell complex at the Hanford Site in southeastern Washington exceed the allowable level. In 1986, there was a spill of 1.3 million curies of concentrated cesium and strontium in B-cell. Cleanup is required, and candidate technologies for cleaning up or otherwise addressing problems associated with the dispersible material are being evaluated by Pacific Northwest Laboratory (PNL). The RE hot-cell complex in 324 Building was constructed in the late 1950s. From the early 1960s until today the complex has been the site of numerous research, development, and demonstration programs using radioactive and hazardous materials. In mid-FY 1988, a program to clean B-cell was initiated. At present, dispersible material has been collected from 45% of the cell floor area, and 64% of the equipment and support racks have been removed from the cell. The evaluation of decontamination procedures are described

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE94003237; NTIS; US Govt. Printing Office Dep.

Files

25058498.pdf

Files (3.8 MB)

Name Size Download all
md5:9aacb288046fb5058a27595d262aa458
3.8 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
82 p.
Report number
PNL--8907

Optional Information

Contract/Grant/Project number
Contract AC06-76RL01830
Funding organization
USDOE, Washington, DC (United States).