Published May 2009
| Version v1
Miscellaneous
Review on ROP update methodology for CANDU-6 Plant
Creators
- 1. Korea Electric Power Research Institute, Daejeon (Korea, Republic of)
Description
CANDU6, Pressurized Heavy Water Reactor (PHWR) has Regional Overpower Protection (ROP) system to prevent the sub-channel from intermittent dryout during slow loss of reactivity control event. The thermal hydraulic condition, determining ROP trip set point, experiences aging effects as time goes. To keep an appropriate safety margin, tracking of operational changes should be done
Additional details
Publishing Information
- Publisher
- KNS
- Imprint Place
- Daejeon (Korea, Republic of)
- Imprint Title
- Proceedings of the KNS spring meeting
- Imprint Pagination
- [1 CD-ROM]
- Journal Page Range
- [2 p.]
Conference
- Title
- 2009 spring meeting of the KNS
- Dates
- 18-23 May 2009
- Place
- Jeju (Korea, Republic of)
INIS
- Country of Publication
- Korea, Republic of
- Country of Input or Organization
- Korea, Republic of
- INIS RN
- 40099595
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- AGING; CANDU TYPE REACTORS; CONTROL; DRYOUT; REACTIVITY; SAFETY MARGINS; THERMAL HYDRAULICS
- Descriptors DEC
- FLUID MECHANICS; HEAVY WATER MODERATED REACTORS; HYDRAULICS; MECHANICS; POWER REACTORS; PRESSURE TUBE REACTORS; REACTORS; THERMAL REACTORS
Optional Information
- Notes
- 2 refs, 1 fig