Published May 2009 | Version v1
Miscellaneous

Review on ROP update methodology for CANDU-6 Plant

  • 1. Korea Electric Power Research Institute, Daejeon (Korea, Republic of)

Description

CANDU6, Pressurized Heavy Water Reactor (PHWR) has Regional Overpower Protection (ROP) system to prevent the sub-channel from intermittent dryout during slow loss of reactivity control event. The thermal hydraulic condition, determining ROP trip set point, experiences aging effects as time goes. To keep an appropriate safety margin, tracking of operational changes should be done

Part of:
Proceedings of the KNS spring meeting

Additional details

Publishing Information

Publisher
KNS
Imprint Place
Daejeon (Korea, Republic of)
Imprint Title
Proceedings of the KNS spring meeting
Imprint Pagination
[1 CD-ROM]
Journal Page Range
[2 p.]

Conference

Title
2009 spring meeting of the KNS
Dates
18-23 May 2009
Place
Jeju (Korea, Republic of)

INIS

Country of Publication
Korea, Republic of
Country of Input or Organization
Korea, Republic of
INIS RN
40099595
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
AGING; CANDU TYPE REACTORS; CONTROL; DRYOUT; REACTIVITY; SAFETY MARGINS; THERMAL HYDRAULICS
Descriptors DEC
FLUID MECHANICS; HEAVY WATER MODERATED REACTORS; HYDRAULICS; MECHANICS; POWER REACTORS; PRESSURE TUBE REACTORS; REACTORS; THERMAL REACTORS

Optional Information

Notes
2 refs, 1 fig