Power generation costs for alternate reactor fuel cycles

Description

The total electric generating costs at the power plant busbar are estimated for various nuclear reactor fuel cycles which may be considered for power generation in the future. The reactor systems include pressurized water reactors (PWR), heavy-water reactors (HWR), high-temperature gas cooled reactors (HTGR), liquid-metal fast breeder reactors (LMFBR), light-water pre-breeder and breeder reactors (LWPR, LWBR), and a fast mixed spectrum reactor (FMSR). Fuel cycles include once-through, uranium-only recycle, and full recycle of the uranium and plutonium in the spent fuel assemblies. The U3O8 price for economic transition from once-through LWR fuel cycles to both PWR recycle and LMFBR systems is estimated. Electric power generation costs were determined both for a reference set of unit cost parameters and for a range of uncertainty in these parameters. In addition, cost sensitivity parameters are provided so that independent estimations can be made for alternate cost assumptions

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS., PC A03/MF A01.

Files

12573982.pdf

Files (1.1 MB)

Name Size Download all
md5:5ab2afed7958cfee0ce73d62fe81455e
1.1 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
47 p.
Report number
ORNL/TM--7376