Kori 1 SBO and maintenance rule in Korea

  • 1. KAERI, Daejeon (Korea, Republic of)

Description

On February 9, 2012, during the 29th refueling outage of Kori 1 nuclear power plant, a station blackout (SBO) occurred and the event was not reported for a long time. By reviewing the Kori 1 SBO event, we are trying to find a necessary system or process to prevent the similar event in this paper. One of reason of the SBO event is the lack of a configuration control including a safer outage work scheduling. It is discussed here why the configuration control is not working even though it is known that the maintenance rule (MRule) is adopted in KHNP. After the SBO event, two main actions were taken by KHNP and NSSC(Nuclear Safety and Security Commission); 1) extended overhaul period and 2) evaluation of outage work schedule by regulatory body. It is also discussed in this paper how these two actions can be performed

Part of:
Proceedings of the KNS autumn meeting

Additional details

Publishing Information

Publisher
KNS
Imprint Place
Daejeon (Korea, Republic of)
Imprint Title
Proceedings of the KNS autumn meeting
Imprint Pagination
[1 CD-ROM]
Journal Page Range
[2 p.]

Conference

Title
2012 autumn meeting of the KNS
Dates
24-26 Oct 2012
Place
Kyoungju (Korea, Republic of)

INIS

Country of Publication
Korea, Republic of
Country of Input or Organization
Korea, Republic of
INIS RN
44062848
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
CONTROL; KORI-1 REACTOR; MAINTENANCE; OUTAGES; REGULATIONS; REPUBLIC OF KOREA
Descriptors DEC
ASIA; DEVELOPING COUNTRIES; ENRICHED URANIUM REACTORS; LAWS; POWER REACTORS; PWR TYPE REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS

Optional Information

Notes
4 refs, 3 figs