Published January 2002 | Version v1
Report Open

Radiation monitoring data on the power-up test of HTTR. Results up to 20 MW operation

  • 1. Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment

Description

The High Temperature Engineering Test Reactor (HTTR) have completed the Power-up test of 9 MW (the single and parallel loaded operation) in the rated operation mode. After that the Power-up test in the rated operation mode and the high-temperature test operation mode with a thermal output of 20 MW (the single and parallel loaded operation) were performed between January 16, 2001 and June 10, 2001. This report describes the radiation monitoring data carried out during the HTTR Power-up test in the rated operation mode and the high-temperature test operation mode with a thermal output of 20 MW. The followings were concluded from these radiation monitoring data. The monitoring of radioactive gaseous effluents and the radiation protection for the works will be easy to do and the exposure dose of the workers will be kept the low level. (author)

Availability note (English)

Available from INIS in electronic form; Also available from JAEA; URL: http://jolisf.tokai-sc.jaea.go.jp/pdf/tec/JAERI-Tech-2001-092.pdf

Files

37002465.pdf

Files (12.9 MB)

Name Size Download all
md5:2635d3a534edb51b9fcf8bd138e8305d
12.9 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
86 p.
Report number
JAERI-Tech--2001-092

Optional Information

Notes
5 refs., 39 figs., 17 tabs.; This record replaces 33043401