Restart of Hanford K Reactor as alternative to restart of L-reactor at SRP
Description
As part of the decision process and environmental review associated with the restart of L-Reactor, possible alternative actions to provide the needed additional capacity for defense nuclear materials are being reviewed and compared with the proposed action, resumption of L-Reactor operation at the Savannah River Plant (SRP) by 1984. One such alternative would be to restart one of the retired K Reactors, KE or KW, at the Hanford Site. This report addresses the viability of this option in relation to the proposed action. Restarting one of the Hanford K-Reactors is not a viable alternative to resuming operation of L-Reactor at SRP. The two K-Reactors have been officially retired, are being dismantled, and are scheduled for decontamination and decommissioning. Upgrading one of the K-Reactors for resumed operation would take at least five years and would cost two to three times more than the renovation of L-Reactor, which is almost completed
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS, PC A02/MF A01 as DE84002950.
Files
Additional details
Publishing Information
- Imprint Pagination
- 4 p.
- Report number
- DPST--83-667
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 15025681
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- COST; FEASIBILITY STUDIES; K REACTOR; L REACTOR; REACTOR START-UP; RETROFITTING
- Descriptors DEC
- HEAVY WATER MODERATED REACTORS; OPERATION; PRODUCTION REACTORS; REACTOR OPERATION; REACTORS; SPECIAL PRODUCTION REACTORS