Published 1992 | Version v1
Report Restricted

Risk impact of two accident management strategies

Description

This report probabilistic Risk Assessment is used to evaluate two accident management strategies: intentionally depressurizing the reactor coolant system of a pressurized water reactor to prevent containment-pressurization during high pressure melt ejection, and flooding the containment of a boiling water reactor to prevent or delay vessel breach. Sensitivity studies indicated that intentional depressurization would not provide a significant risk reduction at Surry. A preliminary evaluation of the containment flooding strategy indicated that it might prove beneficial for some plants, but that further strategy development would be needed to fully evaluate the strategy-

Availability note (English)

MF available from INIS under the Report Number; OSTI as DE93005376; NTIS; INIS; US Govt. Printing Office Dep.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
17 p.
Report number
SAND--92-1808C

Conference

Title
20. water reactor safety information meeting.
Dates
21-23 Oct 1992.
Place
Bethesda, MD (United States).

Optional Information

Contract/Grant/Project number
Contract AC04-76DP00789
Funding organization
Nuclear Regulatory Commission, Washington, DC (United States).
Secondary number(s)
CONF-921007--15.