Description
It is required for nuclear power plant construction to reduce construction cost and shorten construction period. An early and accurate construction planning including schedule coordination among the companies has recently become more important and it is possible to obtain necessary information for construction planning in early stage. In this situation, we have been developing a visualization system for construction engineering for nuclear power plants. This system has an interface with the existing Plant Layout 3D-CAD system and consists of three sub systems: (1) Scheduling and simulation system, (2) Yard planning system and (3) Scaffolding planning system. This paper describes overview of this system. This visualization system is very helpful for construction engineers to easily understand situation and environment around installation area, to easily plan a work sequence and confirm the planned schedule, and it is also effective for customers and workers to understand the planning. As a result, this visualization system enables safety and high quality construction. (author)
Additional details
Additional titles
- Original title (Japanese)
- Dai-7-kai doryoku, enerugi gijutsu shinpojiumu koen ronbunshu
Publishing Information
- Publisher
- Japan Society of Mechanical Engineers
- Imprint Place
- Tokyo (Japan)
- Imprint Title
- The 7th national symposium on power and energy systems (SPES 2000)
- Imprint Pagination
- 478 p.
- Journal Page Range
- p. 428-433
Conference
- Title
- 7. national symposium on power and energy systems
- Acronym
- SPES 2000
- Dates
- 31 Oct - 1 Nov 2000
- Place
- Tokyo (Japan)
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 32038266
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- COMPUTER GRAPHICS; COMPUTERIZED SIMULATION; CONSTRUCTION; FINANCING; INSTALLATION; NUCLEAR POWER PLANTS; PLANNING; PROGRAM MANAGEMENT; SCHEDULES; TRAINING
- Descriptors DEC
- EDUCATION; MANAGEMENT; NUCLEAR FACILITIES; POWER PLANTS; SIMULATION; THERMAL POWER PLANTS
Optional Information
- Notes
- 1 ref., 7 figs. Imprint:Dai-7-kai doryoku, enerugi gijutsu shinpojiumu koen ronbunshu