Published December 2006 | Version v1
Journal article

The Identification of Financing Strategy for the Construction of NPP Type Opr-1000 at Muria Peninsula

  • 1. Center for Development of Nuclear Energy, BATAN, Tangerang (Indonesia)

Description

The study for identification of financing strategy for the construction of OPR-1000 at Muria Peninsula have been done. This study is continuation of previous study with title The Economic and Financing Viability of the OPR-1000 Construction at Muria Peninsula. In the previous study have been the economic and financing viability of OPR-1000 construction. The economic viability was known by obtained the generation cost, electricity tariff and construction cost. The meanwhile, the financing viability was known by obtained Net Present Value (NPV), Internal Rate of Return (IRR) and Payback Period (P) by using KEPCO Spread Sheet. From the calculation of economic and financing viability in base case, have been obtained the result of electricity tariff, IRR, FNPV and Payback Period for total investment is 6.640 cent/kWh (after Value Added Tax), 10.37%, US$ 90.52 million and 12.11 years, respectively. From this result of economic and financing viability in base case, have been carried out sensitivity analysis to technical parameter (capacity factor) and economic parameter (discount rate). The result of sensitivity analysis to be used for identifying financing strategy in order to obtain the best and optimal economic and financing viability. (author)

Additional details

Additional titles

Original title (Indonesian)
Identifikasi Strategi Pendanaan Pembangunan PLTN Tipe Opr-1000 di Semenanjung Muria.

Publishing Information

Journal Title
Jurnal Pengembangan Energi Nuklir
Journal Volume
8
Journal Issue
2
Journal Page Range
p. 19-28
ISSN
1410-9816

Optional Information

Notes
6 refs.; 4 tabs.;