Published March 2004
| Version v1
Report
HIRFL-CSR control room layout
Description
The design consideration of Central Control Room for Heavy Ion Research Facility Lanzhou and Cooler Storage Ring is based on HIRFL-CSR Control System Concept, Architecture [1][2] and Operator environment. The main function of the control room is to operate accelerator through Web-link and display the status of the facility. (author)
Additional details
Publishing Information
- Imprint Title
- Proceedings of the 4th workshop on accelerator operation: WAO 2003
- Imprint Pagination
- 177 p.
- Journal Page Range
- p. 81-82
- Report number
- KEK-PROC--2003-19
Conference
- Title
- WAO 2003
- Acronym
- 4. workshop on accelerator operation
- Dates
- 10-14 Mar 2003
- Place
- Hayama, Kanagawa (Japan); Tsukuba, Ibaraki (Japan)
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 35098142
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- BEAM COOLING; CONSOLES; CONTROL EQUIPMENT; CONTROL ROOMS; CONTROL SYSTEMS; DISPLAY DEVICES; HEAVY IONS; HIRFL CYCLOTRON; ION BEAMS; MAN-MACHINE SYSTEMS
- Descriptors DEC
- ACCELERATORS; BEAMS; CHARGED PARTICLES; COMPUTER OUTPUT DEVICES; COMPUTER-GRAPHICS DEVICES; CYCLIC ACCELERATORS; CYCLOTRONS; EQUIPMENT; HEAVY ION ACCELERATORS; IONS; ISOCHRONOUS CYCLOTRONS
Optional Information
- Notes
- 2 refs., 5 figs.