Published March 2004 | Version v1
Report

HIRFL-CSR control room layout

  • 1. IMP, Lanzhou (China)

Description

The design consideration of Central Control Room for Heavy Ion Research Facility Lanzhou and Cooler Storage Ring is based on HIRFL-CSR Control System Concept, Architecture [1][2] and Operator environment. The main function of the control room is to operate accelerator through Web-link and display the status of the facility. (author)

Part of:
Proceedings of the 4th workshop on accelerator operation: WAO 2003

Additional details

Publishing Information

Imprint Title
Proceedings of the 4th workshop on accelerator operation: WAO 2003
Imprint Pagination
177 p.
Journal Page Range
p. 81-82
Report number
KEK-PROC--2003-19

Conference

Title
WAO 2003
Acronym
4. workshop on accelerator operation
Dates
10-14 Mar 2003
Place
Hayama, Kanagawa (Japan); Tsukuba, Ibaraki (Japan)

INIS

Country of Publication
Japan
Country of Input or Organization
Japan
INIS RN
35098142
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
BEAM COOLING; CONSOLES; CONTROL EQUIPMENT; CONTROL ROOMS; CONTROL SYSTEMS; DISPLAY DEVICES; HEAVY IONS; HIRFL CYCLOTRON; ION BEAMS; MAN-MACHINE SYSTEMS
Descriptors DEC
ACCELERATORS; BEAMS; CHARGED PARTICLES; COMPUTER OUTPUT DEVICES; COMPUTER-GRAPHICS DEVICES; CYCLIC ACCELERATORS; CYCLOTRONS; EQUIPMENT; HEAVY ION ACCELERATORS; IONS; ISOCHRONOUS CYCLOTRONS

Optional Information

Notes
2 refs., 5 figs.