Breeder: now or never
Description
The timing of the commercial introduction of the liquid metal fast breeder reactor (LMFBR) will be an important factor in its ability to supply a significant fraction of the nation's future electrical needs. The number of breeders we can build initially will be limited by the size of our low-cost uranium resources and by the rate at which light water reactors (LWRs) are placed in service. Since this uranium resource is fixed in size while electrical demand will grow geometrically, it is clear that the sooner the breeder is introduced commercially the larger will be the fraction of electrical demand it can supply. An early commercial introduction on an adequate scale requires full-scale resumption of LWR construction and redirection of LMFBR development programs toward a near-term commercial prototype
Additional details
Additional titles
- Augmented title (English)
- Increased construction necessary for breeder development
Publishing Information
- Journal Title
- Proc. Am. Power Conf.
- Journal Volume
- 40
- Series
- Proc. Am. Power Conf.
- Journal Page Range
- 86-91
- ISSN
- 0097-2126
Conference
- Title
- American power conference.
- Dates
- Apr 1978.
- Place
- Chicago, IL, USA.
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 11505862
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- ELECTRIC POWER; LMFBR TYPE REACTORS; NUCLEAR ENERGY; PLUTONIUM; RESERVES; URANIUM ORES; WATER COOLED REACTORS
- Descriptors DEC
- ACTINIDES; BREEDER REACTORS; ELEMENTS; ENERGY; EPITHERMAL REACTORS; FAST REACTORS; FBR TYPE REACTORS; LIQUID METAL COOLED REACTORS; METALS; ORES; POWER; REACTORS; RESOURCES; TRANSURANIUM ELEMENTS
Optional Information
- Secondary number(s)
- CONF-780440--.