Published 1993 | Version v1
Journal article

Shutdown risk management based upon PRA models

  • 1. EPRI, Palo Alto, CA (United States)
  • 2. SAIC, Los Altos, CA (United States)
  • 3. Florida Power Corp., St. Petersburg, FL (United States)

Description

Science Applications International Corporation and Florida Power Corporation (FPC) have joined in a tailored-collaboration project on behalf of Electric Power Research Institute (EPRI) to provide shutdown risk management analysis products for EPRI-member utilities. The objectives of the shutdown project are to (1) determine the usefulness of plant safety status information derived from component out-of-service data available from the outage schedule; (2) demonstrate that shutdown safety and reliability models can be efficiently adapted from a probabilistic risk assessment (PRA) model to support shutdown analysis; (3) show that computerized data sources containing shutdown schedule information are available and applicable to the model; (4) demonstrate that software can be created to process the information in a realistic time frame; and (5) use the software tool to assist in the development of the outage schedule and support an actual outage. In addition, the resources required to produce a complete riskbased outage management tool in a subsequent project phase are determined. Use of FPC's investment in the Crystal River-3 PRA can save FPC as much as a million dollars in creating the logic necessary to support a component-level shutdown analysis

Additional details

Publishing Information

Journal Title
Transactions of the American Nuclear Society
Journal Volume
69
Journal Page Range
p. 275.
ISSN
0003-018X
CODEN
TANSAO

Conference

Title
American Nuclear Society (ANS) winter meeting.
Dates
14-18 Nov 1993.
Place
San Francisco, CA (United States).

INIS

Optional Information

Secondary number(s)
CONF-931160--.