Reasons for decision in the matter of Alliance Pipeline Ltd. : facilities and toll methodology
Description
In February 2007, Alliance Pipeline Ltd. applied to the National Energy Board for approval to construct a new 5.7 MW compressor station at its existing Taylor Junction valve and pig trap site in northeastern British Columbia. The project requires 22. ha of permanent footprint for the proposed compressor site and 1.8 ha of temporary construction workspace. The expansion would increase firm receipt capacity from the area by 4.25 million cubic metres per day. The planned in-service date for the new station is November 2008. Alliance also applied for approval for certain amendments to its transportation tariff, such as the introduction of a new receipt only services (ROS) with regard to the incremental capacity from the new installation. Alliance also proposed an ROS secondary receipt point toll to promote high use of the available ROS capacity. The company proposed that the generated revenues be treated as a credit to its total revenue requirements and that the associated capital costs be treated as part of its rate base. This document described the hearing process that addressed the need for the proposed facilities; consultation, socio-economic and safety issues; existing tariff and founding compact; open seas and industry consultation; and, impact on existing services. Arguments from the Canadian Association of Petroleum Producers were presented on all issues. The views of the Parties and the Board were also presented with regards to capital and operating costs to shippers, fuel costs, and impacts on existing services. Upon review of the environmental screening report, the Board considered that the proposed facility would not likely cause significant adverse environmental effects. The Board approved the applied-for facilities as well as the amendments to its transportation tariff. 1 fig., 2 appendices
Availability note (English)
Available from the National Energy Board, 444 Seventh Avenue SW, Calgary, Alberta T2P 0X8Additional details
Additional titles
- Augmented title (English)
- Application dated 28 February 2007 for the British Columbia Expansion Project
Publishing Information
- Publisher
- National Energy Board
- Imprint Place
- Calgary, AB (Canada)
- ISBN
- 978-0-662-46620-8
- Imprint Pagination
- 37 p.
- Series
- Reasons for Decision
INIS
- Country of Publication
- Canada
- Country of Input or Organization
- Canada
- INIS RN
- 39001863
- Subject category
- S29: ENERGY PLANNING, POLICY AND ECONOMY; S03: NATURAL GAS;
- Resource subtype / Literary indicator
- Legislative Material
- Descriptors DEI
- ADMINISTRATIVE PROCEDURES; BRITISH COLUMBIA; CHARGES; CONSTRUCTION; ENVIRONMENTAL EFFECTS; GAS COMPRESSORS; LEGISLATIVE TEXT; LICENSE APPLICATIONS; NATURAL GAS INDUSTRY; PROPOSALS; SALES
- Descriptors DEC
- ADMINISTRATIVE PROCEDURES; CANADA; COMPRESSORS; DEVELOPED COUNTRIES; INDUSTRY; NORTH AMERICA
Optional Information
- Notes
- Catalogue no. NE22-1/2007-7E. This report is published separately in English and French.
- Secondary number(s)
- GHW--1-2007