Published 1995 | Version v1
Book

11 years of experience with heat extraction at the Beznau I and II nuclear power plant for district heating

Creators

  • 1. Nordostschweizerische Kraftwerke AG, Baden (Switzerland)

Description

The district heating system installed since 1984 at the Beznau Nuclear Power Plant, consists of a 30 km main pipeline and 90 km of local distribution pipes in 11 communities. The regional district heat supply system has become an integrated part of the regional infrastructure for around 18000 inhabitants of the lower Aare valley. A total of 80 MWth heat load is expected to be installed within the next years (1994: 65 MWth). Using all the 5 existing Swiss nuclear power plants sited in thickly settled areas for district heating could avoid the burning of about 2 millions of oil and the emission of 6 millions tons of CO2. 3 refs., 3 figs

Part of:
Designing a sustainable electric system for the 21. Century. 5 sessions

Additional details

Publishing Information

Publisher
UNIPEDE.
Imprint Place
Paris (France)
Imprint Title
Designing a sustainable electric system for the 21. Century. Session 3: Power producers and global climate change issues
Imprint Pagination
155 p.
Journal Page Range
p. 147-155.

Conference

Title
New Electricity 21 Conference on Designing a Sustainable Electric System for the 21. Century.
Dates
22-24 May 1995.
Place
Paris (France).

Optional Information