Published 2019 | Version v1
Miscellaneous

Study of PF-ring infrastructure improvements for the PF upgrade plan

  • 1. High Energy Accelerator Research Organization (KEK), Tsukuba, Ibaraki (Japan)

Description

Temperature measurements have been performed in the PF-ring tunnel for more than one year in order to understand the infrastructure performance and the temperature stability of the PF-ring towards the PF upgrade plan, where better beam stability is required. Based on the temperature measurements, possible improvements of the PF-ring infrastructure such as air-conditioning and cooling-water systems have been studied. In this paper, we describe the temperature measurement results and the PF-ring infrastructure improvements. (author)

Availability note (English)

Available from https://www.pasj.jp/web_publish/pasj2019/proceedings/PDF/WEPH/WEPH025.pdf
Part of:
Proceedings of the 16th annual meeting of Particle Accelerator Society of Japan

Additional details

Additional titles

Original title (Japanese)
PF高度化計画に向けたPFリングインフラ設備改善策の検討

Publishing Information

Imprint Title
Proceedings of the 16th annual meeting of Particle Accelerator Society of Japan
Imprint Pagination
[1296 p.]
Journal Page Range
p. 348-352

Conference

Title
16. annual meeting of Particle Accelerator Society of Japan
Acronym
PASJ2019
Dates
31 Jul - 3 Aug 2019
Place
Kyoto (Japan)

Optional Information

Notes
Imprint:#7B2C#16#56DE# #65E5##672C##52A0##901F##5668##5B66##4F1A##5E74##4F1A#