Complex nuclear safety evaluation of the Bohunice V-1 nuclear power plant

Creators

Description

The safety concept of V-230 type reactor units dates back to the late 1960s. The units fail to be sufficiently dimensioned for emergency cooling of the reactor core and are fitted with no containment. So far, operating experience is good. The availability factor is 71.5% for unit 1 and 77.8% for unit 2. There occur 1 to 3 unscheduled shutdowns annually. The quality of steam generator tubes is very good. A complex safety assessment of the plant was accomplished in 1990. It concerned the concept and criteria of safety assessment, the earthquake situation, the condition of the primary coolant circuit equipment, the control system, the effect of the human factor, and preparedness of emergency plans. OSART and ASSET missions were accomplished at the plant. Based on the results of the missions as well as of inspections by the State Surveillance over Nuclear Safety, the decision has been adopted to operate the plant not longer than till 1995; the further fate of the plant will be decided on according to a future technical and economic analysis. (M.D.)

Additional details

Additional titles

Original title (Czech)
Komplexni hodnoceni jaderne bezpecnosti jaderne elektrarny V-1

Publishing Information

Journal Title
Bulletin CJF
Journal Issue
no.1
Journal Page Range
p. 1-4.
CODEN
BCCFEM

Optional Information

Notes
For the English version of the Bulletin of the Czech Nuclear Forum, contact the CNF Secretariat, M. Cibulkove 8, 140 00 Prague 4, Czech Republic.