The economics of power generation in Alberta : the pool price impact of Genesee Unit 3

Creators

  • 1. EPCOR Generation, Edmonton, AB (Canada)

Description

Alberta power pool prices for year 2000 were reviewed. The model assumptions were: studies based on PROSYM market simulations; base-load units offered at incremental cost; and, considerations in those cases where system gas units were modeled as coal units. The current situation in Alberta was reviewed. The Genesee 3 coal-fired facility is expected to be completed in the Winter 2004-2005 with an efficiency of 8 to 18 per cent better than other coal units. A graph was shown to examine the expected impact of Genesee 3 on Alberta prices. Electricity prices would increase during the period 2005-2008 without Genesee 3. Alberta prices are affected by factors such as: load-resource balance, fuel prices, cost of new capacity, offer strategy, available transmission, and tie lines. A capacity surplus is expected for the period 2003-2008. In addition, good correlation is expected for pool prices with gas prices. With Genesee 3 in operation, lower pool prices are expected in Alberta. figs

Additional details

Publishing Information

Publisher
Canadian Institute
Imprint Place
Toronto, ON (Canada)
ISBN
1-55398-168-5
Imprint Title
Papers of a Canadian Institute conference : Western electricity markets forum : Are you prepared for regulatory restructuring and standard market design?
Imprint Pagination
[250 p.]
Series
Canadian Institute Conferences
Journal Page Range
p. 1-15

Conference

Title
Western electricity markets forum : Are you prepared for regulatory restructuring and standard market design?
Acronym
A Canadian Institute conference
Dates
24-25 Feb 2003
Place
Calgary, AB (Canada)

Optional Information

Notes
Imprint:725BO3-CAL