Owner quality management of nuclear power engineering under EPC and independent supervision model
Description
Based on the study of relevant laws and regulations, combined with the current situation of engineering procurement construction EPC mode of nuclear power project in China, this paper analyzes the position and occupations of the NPP owner, general contractor and the supervision unit, and expounds the ideas and methods of the NPP owner for NPP quality management. This article considers that the owner should selectively participate in the quality management of important activities based on the idea of hierarchical management of quality assurance and hierarchical supervision, comprehensively considering factors such as human resources, experience and ability, so as to maximize the utilization of limited resources. (author)
Additional details
Identifiers
Publishing Information
- Journal Title
- Nuclear Safety (Beijing)
- Journal Volume
- 19
- Journal Issue
- 6
- Journal Page Range
- p. 1-5
- ISSN
- 1672-5360
INIS
- Country of Publication
- China
- Country of Input or Organization
- China
- INIS RN
- 55086696
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Descriptors DEI
- CHINA; CONSTRUCTION; CONTRACT MANAGEMENT; CONTRACTORS; ENGINEERING; NUCLEAR POWER PLANTS; PROCUREMENT; QUALITY ASSURANCE; REGULATIONS
- Descriptors DEC
- ASIA; BUSINESS; LAWS; MANAGEMENT; NUCLEAR FACILITIES; POWER PLANTS; PROGRAM MANAGEMENT; QUALITY MANAGEMENT; THERMAL POWER PLANTS
Optional Information
- Notes
- 2 figs., 4 tabs., 10 refs.; http://dx.doi.org/10.16432/j.cnki.1672-5360.2020.06.001