Published July 1997
| Version v1
Report
Restricted
An evaluation of the effectiveness of flow augmentation in the Snake River, 1991-1995. Phase 1: Final report
Creators
- 1. HDR Engineering, Inc., Salt Lake City, UT (United States)
- 2. Bio Analysts, Inc., Redmond, WA (United States)
Description
The purpose of this evaluation was to estimate the volume and shape of flow augmentation water delivered in the Snake Basin during the years 1991 through 1995, and to assess the biological consequences to ESA-listed salmon stocks in that drainage. HDR Engineering, Inc. calculated flow augmentation estimates and compared their values to those reported by agencies in the Northwest. BioAnalysts, Inc. conducted the biological evaluation
Availability note (English)
Available from INIS in electronic form; ALSO AVAILABLE FROM OSTI AS DE98005133; NTIS
Files
Additional details
Publishing Information
- Imprint Pagination
- 310 p.
- Report number
- DOE/BP--24576-1
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 30009188
- Subject category
- S13: HYDRO ENERGY;
- Resource subtype / Literary indicator
- Numerical Data, Progress Report
- Descriptors DEI
- COLUMBIA RIVER BASIN; ENVIRONMENTAL IMPACTS; FISHERIES; FLUID FLOW; HABITAT; HYDROELECTRIC POWER PLANTS; NUMERICAL DATA; PROGRESS REPORT; SALMON
- Descriptors DEC
- ANADROMOUS FISHES; ANIMALS; AQUATIC ORGANISMS; DATA; DOCUMENT TYPES; FISHES; INFORMATION; POWER PLANTS; VERTEBRATES; WATERSHEDS
Optional Information
- Contract/Grant/Project number
- Contract DE-AC79-92BP24576