Published May 18, 1999 | Version v1
Miscellaneous

Preparing Canada's power systems for transition to the year 2000 : Y2K readiness assessment results for Canadian electric utility companies : first quarter 1999

Description

The effort made by Canadian electric utilities to minimize any power disruptions during the year 2000 (Y2K) transition is discussed and the state of readiness of the electric power industry with respect to the Y2K computer challenge is outlined. Canadian utilities started addressing Y2K issues several years ago, and today, reports show that every major electric utility in Canada is either on, or ahead of schedule to meet the industry established milestones for Y2K readiness. This report includes the assessment of all of Canada's large electric utilities, plus about 95 per cent of Canada's small distribution utilities. On average, the bulk electric utilities in Canada expect to be Y2K ready by mid-June 1999. This means that equipment and systems will operate properly for all dates including Y2K, or that there will be an operating strategy in place to mitigate the effects of any improper operations of equipment or systems. In terms of overall preparations for Y2K, Canada is ahead of the North American averages. Bulk electric utilities for non-nuclear generation are now 100 per cent complete in the inventory phase, 99 per cent complete in the assessment phase, and 91 per cent complete in the remediation/testing phase. For nuclear generation, completion rates are the same except for the remediation/testing phase which is 97 per cent complete. 1 tab., 21 figs

Availability note (English)

Available from the Canadian Electricity Association website www.canelect.ca or through interlibrary loan from the CANMET Information Centre, 555 Booth St., Ottawa, Ont., K1A 0G1, tel. (613) 995-4132 or FAX (613) 995-8730

Additional details

Publishing Information

Publisher
Canadian Electricity Association
Imprint Place
Montreal, PQ (Canada)
Imprint Pagination
27 p.

INIS

Country of Publication
Canada
Country of Input or Organization
Canada
INIS RN
30041878
Subject category
S24: POWER TRANSMISSION AND DISTRIBUTION; S99: GENERAL AND MISCELLANEOUS;
Resource subtype / Literary indicator
Progress Report, Non-conventional Literature
Descriptors DEI
COMPUTERIZED CONTROL SYSTEMS; ELECTRIC UTILITIES; EMERGENCY PLANS; PROGRESS REPORT; RELIABILITY; SYSTEM FAILURE ANALYSIS
Descriptors DEC
CONTROL SYSTEMS; DOCUMENT TYPES; ON-LINE CONTROL SYSTEMS; ON-LINE SYSTEMS; PUBLIC UTILITIES; SYSTEMS ANALYSIS

Optional Information

Notes
This is an addendum to: Preparing the electric power systems of North America for the transition to the year 2000, a report prepared in April, 1999 by the North American Electric Reliability Council