Published August 1995
| Version v1
Journal article
Testing of the HP G-link chip set for an event builder application
- 1. Fermi National Accelerator Lab., Batavia, IL (United States)
Description
The Hewlett Packard HDMP-1000 G-Link transmitter and receiver chip set was tested for an event builder application. The re-lock time of the serial link when a data path is changed is less than 30 micros provided fill frames are transmitted. With a 1 kHz data path switching rate, this results in less than a 3% data rate inefficiency due to re-synchronization, which makes the HP G-Link chip set effective for use in a large event builder for a hadron collider experiment
Additional details
Publishing Information
- Journal Title
- IEEE Transactions on Nuclear Science
- Journal Volume
- 42
- Journal Issue
- 4Pt1
- Journal Page Range
- p. 882-886.
- ISSN
- 0018-9499
- CODEN
- IETNAE
Conference
- Title
- medical imaging conference.
- Acronym
- Nuclear science symposium
- Dates
- 30 Oct - 5 Nov 1994.
- Place
- Norfolk, VA (United States).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 27016012
- Subject category
- S46: INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND TECHNOLOGY;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- DATA ACQUISITION SYSTEMS; DATA TRANSMISSION; DATA TRANSMISSION SYSTEMS; HIGH ENERGY PHYSICS; PARTICLE IDENTIFICATION; PERFORMANCE TESTING; RADIATION DETECTORS
- Descriptors DEC
- COMMUNICATIONS; MEASURING INSTRUMENTS; PHYSICS; TESTING
Optional Information
- Secondary number(s)
- CONF-941061--.